MA

Customer success

P1
Colbie's home — callbacks with retry state (the sticky notes are dead), crew ETA read-through from dispatch, referral + service intake. Hallway pings become tasks.
Callbacks due today
4
incl. 1 overdue (attempt 3/3)
Awaiting schedule confirm
3
Remi row is inside its 24h SLA
Service tickets open
2
3 total · 1 dispatched
Referrals this month
3
incl. 1 solar detach/reset

Callback queue

replaces sticky notes — every retry carries state
AR can generate collection-call tasks directly (the Rachael → Colbielane, formalized) — and “Cory tells me on the spot” becomes a task here, not a hallway ping.
J-1042Dave & Marcia Hendersoninsuranceschedule confirmdue today
attempt 2/3 · next today 2:00p
J-1056Hannah & Pete Kowalskid2dschedule confirmdue today
attempt 1/3 · next today 4:30p
J-1052Grant & Ellie Mossinsurancecollection calldue today
attempt 2/3 · next Tue 07-21 · from AR — Rachael
J-1047Tom Brackenretailcollection callretry scheduled
attempt 1/3 · next Wed 07-22 · from AR — Rachael
J-1044Luis Ortegaretailcolor follow-upretry scheduled
attempt 1/3 · next Wed 07-22
J-1046Remi (Partner) — unit 4 tenantremischedule confirmoverdue
attempt 3/3 · next today 11:00a · from dispatch — Cory
J-1055Tom Brackenretailsatisfaction checkretry scheduled
attempt 1/2 · next Thu 07-23
J-1054Nina Callowayd2dsatisfaction checknew
attempt 0/2 · next after install

Crew ETA (from dispatch)

read-only — kills the “where’s the crew?” inbound class
JobCrewStateETA
J-1046
Remi (Partner) — unit 4
Summit Exteriorsarrivedon site 7:40a
J-1042
Dave & Marcia Henderson
Vasquez Roofingon my wayTue 07-21 ~7:15a (delivery lands tonight)
J-1048
Sandra Whitfield
GreenLine LandscapedispatchedWed 07-22 8:00a
J-1047
Tom Bracken
Vasquez Roofingdonewrapped Fri 07-10 4:20p
J-1056
Hannah & Pete Kowalski
— (WO-706 unassigned)dispatchedpending crew assignment

Same states the sub taps on the dispatch link (E1) — CS sees them live, homeowner questions answered without a radio call.

Touchpoint templates

sequences differ BY CHANNEL
remiRemi sequence
  1. 1Color confirm
    on deal received
  2. 2Schedule confirm
    on WO published — ≤24h SLA (25% upfront)
  3. 3Schedule-date call
    day before install
d2dD2D sequence
  1. 1Welcome call
    day after signing
  2. 2Schedule call
    on ready-to-schedule
  3. 3Post-completion satisfaction check
    2 days after install

Post-completion satisfaction check is a first-class step (D2D), not an afterthought. Insurance/retail sequences fold in with Rachel’s pack.

Referral intake

Carla Jensen — 1490 E Aspen Way, Sandyrouted
referred by Dave & Marcia Henderson (J-1042) · original rep Dominic (auto-resolved)
Bill & June Ostler — Rivertonnew
referred by Hannah & Pete Kowalski (J-1056) · original rep Dominic (auto-resolved)
Sunrun install @ 633 N Vine Stappointment set☀ solar detach/reset
referred by John Frampton (solar — external) · original rep — (external actor, no rep) (auto-resolved)
solar detach/reset lane — panels off → reroof → panels back — external actor lane (John Frampton)

Rep resolution is automatic off the referring HO’s job — 3 manual lookups today, zero here. The resolved rep is also the commission datum.

Service / warranty

SV-01Tom Brackentriagepast work: J-1055
Pipe-boot leak at master bath vent after Saturday rain
SV-02Grant & Ellie Mossnewpast work: J-1052
Ridge cap shingle lifted — NE corner
SV-03Sandra Whitfielddispatchedpast work: J-1048
Drip zone 2 not running — controller fault?

Repair-on-past-work finally has a home: lookup past job → service ticket → dispatch. No more name → JN lookup → Ethan tribal routing.