Rep app — native SwiftUIseparate from the web platform

Wireframed here for the walkthrough. Phases P1–P4: P1 canvass · P2 capture + Today · P3 handoff + my-jobs · P4 close + Pay. Screen map ↗

9:41▂▄▆5G

Nina Calloway

633 N Vine St · Salt Lake City, UT · J-1054
M6 · P3
phase P3 — after the phase-boundary conversation (open item 7)
Where it is
Inspection in progress1d
Finish inspection shot-list (7/12)
My gate items
  • !Inspection shot-list 100% (7/12)
  • !Damage assessment recorded
Open shot-list (7/12) →
Evidence · 7 photos
📷
📷
📷
📷
📷
📷
+1
Claim
Not filed yet — file after the inspection.
Insurance coach — settles with Rachel's packv1.5

All M-screens · pack: Dominic/Zach R · P2 crosses the old “no-network Phase 1” boundary (open item 7 — makes the network requirement concrete).